企業情報
会社概要
会社沿革
マネジメントシステム
アクセス
繊維技術部
準備工程
製織工程
製造部
裁断加工
延伸加工
スリット加工
キルティング加工
縫製部門
eコマース
お問い合わせ
お知らせ&記事
CLOSE
HOME
繊維技術部
製織工程
Weaving process technical page
Weaving process technical page
① Check the tension of the warp at the weft entrance of the woven fabric
② When the cause is poor opening of the warp
③ Caused by the thread
④ The posture seen from the nozzle is strange.
⑤ When the cause is the cutter on the left
⑥ Check the mounting position of each part near the crank angle of 180 °
⑦ Checking the frame height
⑧ Temple check
⑨ The breeze volume is not suitable
① Sub-nozzle and piping check
② Check the injection timing of the sub nozzle
③ Check the height and angle of the sub nozzle
④ Pressure check of sub-nozzle and Drum pin timing check
① Confirmation of reaching angle and standard deviation
② Check the sub nozzle on the end side
① Check the timing of the end of blowing of the main nozzle
② Check the weft insertion angle and reaching angle
③ Reduce rpm
① Check the distance between the solenoid pin and the measuring length band
② Wear check around the solenoid pin
③ Check the balloon sensor